AIA FORM G704 PDF

May 3, 2021 0 By admin

Do whatever you want with a Aia G fill, sign, print and send online instantly. Securely download your document with other editable templates, any time, with. The Work performed under this Contract has been reviewed and found, to the Construction Manager’s and Architect’s best knowledge, information and belief. THIS TEMPLATE HAS BEEN REPLACED WITH THE UPDATED VERSION AND WILL RETIRE ON MAY 31, IF YOU CONTINUE TO PURCHASE.

Author: Sharr Kegis
Country: Iraq
Language: English (Spanish)
Genre: Photos
Published (Last): 18 July 2010
Pages: 384
PDF File Size: 10.34 Mb
ePub File Size: 15.59 Mb
ISBN: 761-6-34838-434-6
Downloads: 20179
Price: Free* [*Free Regsitration Required]
Uploader: Doujora

It is intended for use on medium-to-large sized projects where payment is based on either a stipulated sum or the cost of the work plus a fee, with or without a guaranteed maximum price.

It is to aai filled out by the contractor and returned to the architect for submission to torm owner. The construction manager provides the owner with a guaranteed maximum price proposal, which the owner may accept, reject, or negotiate. G— may be executed to form the agreement between the owner and the land surveyor once an understanding is reached.

Part A relates to contracts, Part B relates to insurance and bonds, and Part C deals with bidding procedures. AIA Document B— is often used for planning, feasibility studies, and other services that do not follow the phasing sequence of services set forth in B— and other AIA documents.

AIA Document B— was developed to replace B— Parts 1 and 2, and B— expiredbut it more closely follows the format of B— The specific services the non-owner members are required to perform are set forth in the Integrated Scope of Services Matrix, which is part of the C— Target Cost Amendment and is incorporated aja the executed C— AIA Document G— is divided into three parts: A— employs the cost-plus-a-fee method, wherein the owner can monitor cost through periodic review of a control estimate that is revised as the project proceeds.

The Agreement requires the parties to select the payment type from three choices: The consultant, who may or may not be an architect or other design professional, may perform a wide ranging array of services for the owner, including programming and planning, budgeting and cost estimating, project criteria development services, and many others, commencing with initial data gathering and continuing through to post occupancy.

This collaborative process vorm the potential to result in a high quality project for the owner, and substantial monetary and intangible rewards for the other parties.

  DSC IT100 PDF

Document Titles and Prices

E defines the extent to which model users may rely on model content, clarifies model ownership, sets forth BIM standards and file formats, and provides the scope of responsibility for model management from the beginning to the end of the project.

B sets forth five traditional phases of basic services: Additionally, C allows for the non-owner members to receive profit through incentive compensation and goal achievement compensation.

The form allows tracking by bidder of documents issued, deposits received, and documents and deposits returned.

Under A—, the contractor provides a guaranteed maximum price. AIA Document B— primarily provides only the business terms unique to the agreement between the owner and architect, such as compensation details and licensing of instruments of service.

It provides space for the signatures of the owner, contractor, construction manager adviser, and architect, and for a complete b704 of the change.

In addition to compensation for the contract sum, C allows for the contractor to receive additional profit through incentive compensation and goal achievement compensation. AIA Document A— primarily provides only the business terms and conditions unique to the agreement between the owner and contractor, such as compensation details and licensing of instruments of service.

The range of services the architect provides under this scope spans the life of the project and may require the architect to be responsible for preliminary surveys, applications for tax incentives, nominations for landmark status, analysis of historic finishes, and other services specific to historic preservation projects.

Construction Forms | Facilities | University of Nebraska Medical Center

AIA Document B— is a standard form of agreement between owner and architect that contains terms and conditions and compensation details. Two other types of services are delineated in the document: Primary management of the project is the responsibility of the Project Management Team, comprised of one representative from each of the parties.

The Project Executive Team, also comprised of one representative from each of the parties, provides a second level of project oversight and issue resolution. To design and construct the project, the company enters into separate agreements with the architect, construction manager, other non-owner members, and with non-member consultants and contractors.

C— replaces C— expired May B was renumbered only in same content as BINT—, exp ired It is often used for planning, feasibility studies, post-occupancy studies, and other services that require specialized descriptions.

  DVGW W270 PDF

C can be used for a g074 that only provides construction services, or it can also be used for a contractor that will provide both pre-construction and construction services.

A— obligates the contractor to perform the work in accordance with the contract documents, which include A with its attached exhibits, supplementary and other conditions, drawings, specifications, addenda, and modifications.

No Rights to the AIA 2007 Documents after October 2018

B— was renumbered only in same content as B—, expired C assumes and incorporates by reference a preexisting prime agreement between design-builder and architect. Answers to Part C will follow as the contract documents are further developed.

Though written primarily to support a project using integrated project delivery IPDE may also be used on projects delivered by more traditional methods. This scope requires the architect to identify and analyze the threats iaa a facility, survey the facility with respect to those threats, and prepare a risk assessment report.

4specs Discussion Forum: AIA DOCUMENT G

C— is intended to be a flexible document. C is not intended for use in competitive bidding and relies upon an agreed to contract sum, which can be either a stipulated sum fixed price or cost of the work plus a fee, with a guaranteed maximum price. B— replaces BID— expired It provides model language with explanatory notes to assist users in adapting AIA Document B— for use on condominium projects.

This document may be used with a variety of compensation methods. These agreements are written for a stipulated sum, cost of the work with a guaranteed maximum price, and cost of the work without a guaranteed maximum price, respectively. This agreement may be used with a variety of compensation methods, including percentage of construction cost and stipulated sum.

B is extremely abbreviated and is formatted more informally than other AIA agreements. The form asks the requesting party to list the relevant drawing, specification or submittal reviewed in attempting to find the information. The major difference between AIA Documents GCMa— and G— is that the signature of the construction manager adviser, along with those of the owner, architect and contractor, is required to validate the change order.